Bridges and viaducts

A1 - North Motorway. Coimbra South/Coimbra North sub-section. Monitoring of Viaduct C and Viaduct D of Baixa do Mondego.
back
 
 
Partial view of one of the viaducts after the intervention  
Tests “in-situ” - Detection and evaluation of the reinforcement cover with the covermeter
           
 
Tests “in-situ”. Test zones – Reinforcement meshes detected with the covermeter  
Evaluating the concrete’s current resistance – Core drilling
           
 
Tests “in-situ” - Carbonation front of the concrete visible to the naked eye  
Monitoring after intervention (reinforcement corrosion and settlements)
           
back
 
HIGHLIGHTS | CONTACTS | SITE MAP | TECHNICAL FILE