Bridges and viaducts

EN 108 – Bridge over the Mouth of the Sousa River at km 9+440. Rehabilitation and broadening of the Engineering Structures. Concrete characterization tests.
back
 
 
Construction of the bridge  
Lower view of the arch from the side of the left margin – Countering Foundations
           
 
Vehicle with bridge inspection platform  
Vehicle with bridge inspection platform
           
 
Visual Inspection – Survey anomalies – Main beam of the bridge deck  
Visual Inspection – Survey anomalies – Pillar
           
 
Visual Inspection – Survey anomalies – Bridge floor  
Visual Inspection – Survey anomalies – Crack opening measurement
           
 
Survey of anomalies – Evaluation of out of plumb  
Tests “in-situ” - Detection and evaluation of the reinforcement cover with the covermeter
           
 
Tests “in-situ” – Execution of soundings for confirmation of the diameter of the rods  
Tests “in-situ” - Measuring the depth concrete carbonation
           
 
Tests “in-situ” – Reinforcement corrosion evaluation – Measuring corrosion intensity through the polarization resistance technique  
Tests “in-situ” - Reinforcement corrosion evaluation - Measurement of the electric resistivity of the concrete
           
 
Tests “in-situ” - Indirect evaluation of the strength concrete - Rebound hammer test  
Tests “in-situ” – Qualitative concrete evaluation– Ultrasound test through direct method
           
 
Characterizing concrete’s mechanical properties – Core drilling  
Visual concrete characterization– Cores samples drilled before preparation for testing
           