Bridges and viaducts

896 - POFA – Access bridge to Faro beach, rehabilitation project – Series of sonic tests to existing piles
back
 
 
Partial view of the bridge – Indirect foundation using sunken piles  
Gaps in the concrete due to severe corrosion of the reinforcement steel
           
 
Preparing sonic tests – Rebar detection with the covermeter  
Checking pillars geometry
           
 
Sonic pile integrity tests (indirect determination of the length of the piles)      
           
back
 
HIGHLIGHTS | CONTACTS | SITE MAP | TECHNICAL FILE