Bridges and viaducts

EN 305 - Lanheses Bridge over the Lima River – Structural rehabilitation and reinforcement – Series of tests and structural reinforcement – series of sonic tests to on existing piles. 1st phase.
 
back
 
 
General view of the bridge  
Detail of edge expansion joint
           
 
Standard pillar (pendular), with indirect foundation by means of piles poured on site  
Sonic pile integrity tests using the shaft (inaccessible head) – Indirect determination of the length of the pile length
           
back
 
HIGHLIGHTS | CONTACTS | SITE MAP | TECHNICAL FILE